Stream Name Sample Site Date Time TempAir - C Temp H2O - C Tape Down Bottom Tape Down Surface Stage (depth - ft) Gage Type Trans Tube (cm)1st/final Turbidity NTUs Conductivity ty uS/cm pH DO mg/l DO %Sat Rec Suit Appr Precip 24 hr Precip 2 - 5 Days Stream Width Watershed District Longitude Latitude Field Notes Condition Rating Bridge Width Average time Barometric Pressure Wind Speed/Direction Stream Flow CFS Phosphate Con Nitrate Conc. Chem-Turbidity Chem-pH Cloud Cover
Pembina River Vang Bridge 9/21/2004 9:40 12 14.74 27.5 25.3 2.2 N/A 1.6   0.703 8.38 9.5 93.6 4 5 2 in 2.5 in 95 ft Red River-Pembina -98.05599 48.91693 Golf Course Water Pumps   30 ft.                   
Pembina River Vang Bridge 10/15/2004 9:30 2 5.94 28.7 25.2 3.5 N/A   15.2 0.775 8.36 11.51 92.5 4 4 2.8in 3in 75ft Red River-Pembina -98.05599 48.91693 clearer than last time   30 ft.     N 16   2ppm 0ppm 40 JTU 7  
Pembina River Vang Bridge 11/17/2004 9:04 0 0.92 28.2 25.7 2.5 N/A   22 0.835 8.4 14.22 98.6 3 5 0 in. 0 in. 80 ft Red River-Pembina -98.05599 48.91693 raccoon tracks n/mo/m 30 ft.     2mph/west 331.8 CFS         2%
Pembina River Vang Bridge 4/26/2005 9:20 2.9 9.08 29 18.3 10.7 N/A 4.5/2.5 99.9 0.067 7.88 9.49 80 5 3 trace trace 100 ft Red River Pembina -98.05599 48.91693   h/sw/m 30 ft 6.7 sec   18.9mph/NW 3194 CFS 2ppm 0ppm 100+ 6.5 Slightly Cloudy
Pembina River Vang Bridge 5/13/2005 13:00 8.6 9.7 29 21 8.2   5.5/3.4 99.9 0.07 8.12 8.28 90 4 3 .5 in 1.5 in 95 ft Red River-Pembina -98.05599 48.91693     30 ft. 7.77 sec.   17mph N 2849 CFS         mostly cloudy
Pembina River Vang Bridge 6/30/2005   it should follow H instead of ahead                                 Red River-Pembina -98.05599 48.91693     30 ft.                  
Pembina River Vang Bridge 6/28/2005 10:30 15.7 17.46 28 20 8   3/1.5 99.9 0.101 8.02 7.93 82.8 4 3 .5 in 2 in 95 ft Red River-Pembina -98.05599 48.91693 trees down h/sw/m 30 ft. 5.84 sec.   3.4 mph NW 2342.5 CFS 2ppm 2ppm 100+ 8.5 totally cloudy
Pembina River Vang Bridge 7/5/2005 10:15 20.7 18.62 29 20.7 8.3   2.1/1.2 99.9 0.147 7.84 7.5 80.4 4 3 0.5 in 0.5 in 117 ft Red River-Pembina -98.05599 48.91693 trees down h/sw/m 30 ft. 4.2 sec hum-45% 4.0 mph 4162 cfs 2ppm 0ppm 100++ 8 partly cloudy
Pembina River Vang Bridge 8/9/2005 16:00 31.4 23.84 28.5 20 8.5   4.0/2.0 99.9 0.132 8.05 8.03 95.1 3 3 trace trace 98 ft. Red River-Pembina -98.05599 48.91693 beautiful h/sw/m 30 ft. 5.87 sec hum-33% 7.0 mph W 2554 cfs NA NA NA NA 40% cloud cover
Pembina River Vang Bridge 9/5/2005 10:15 25.5 19.54 29 24.25 4.74   6.7/4 137 1.438 8.27 9.18 100.4 3 3 trace trace 90 ft. Red River-Pembina -98.05599 48.91693   n/sw/m 30 ft. 8.03 sec 29.69 in. Hg 5.4 mph E 2623 cfs 3ppm 0ppm NA 7.5 90%
Pembina River Vang Bridge 10/9/2005 13:27 14.8 7.71 28 22.6 3.4   13.0/5.0 43 1.529 8.45 12.7 107 3 3 2.5 in 2.5 in 85 ft Red River-Pembina -98.05599 48.91693   n/mo/m 30 ft. 13.99 sec   6 mph E 729 cfs         1%
Pembina River Vang Bridge 11/1/2005 8:35 11 6.3 29.5 25.8 3.7   14/7 31 1.64 8.52 12.4 99.3 3 3 0.1 in 0.1 in 70 ft Red River-Pembina -98.05599 48.91693 15% log jam l/s/m 30 ft. 12.5 sec   1.2 mph NW 369.6 cfs         100%
Pembina River Vang Bridge 11/2/2005 8:32 8.5 6.3 29.5 26.2 3.3 N/A 17.3/12.3 27 1.626 8.52 12.15 97.3 5 3 .1in .1 in 90 ft Red River-Pembina -98.05599 48.91693 5% obstruction l/mo/m 30 ft. 14.4 sec 29.44 in Hg 3 mph SE 371 cfs          
Pembina River Vang Bridge 4/27/2006 8:50 12.3 11.73 29.5 17 12.5   11.0/7.5 845 0.568 7.84 9.94 91.4 5 5 zero zero 120 ft. Red River-Pembina -98.05599 48.91693 Many tree in and by the river h/sw/m 30 ft. 7.74 sec 29.72 in. Hg 0 mph 3488 cfs 1ppm 2 ppm 100+ JTU 8 0%
Pembina River Vang Bridge 5/26/2006 10:41 16.4 16.16 34 24.6 9.4   4.4/2.6 100+ 0.769 8.13 9.65 98.3 4 4 0.25 in. 1.4 in. 75 ft. Red River-Pembina -98.05599 48.91693 20% obstruction n/sw/m 30 ft. 8.42 sec   5.0 mph NE 1496 cfs .5ppm 0 ppm 100+ JTU 8 100%
Pembina River Vang Bridge 6/22/2006 17:55 18.6 21.6 29.5 26.3 1.8     87 0.817 8.61 9.41   3 1B 3 in. 3 in. 100 ft. Red River-Pembina -98.05599 48.91693   n/sl/m 30 ft. 10.94 sec 29.70 in. Hg 3 mph E 499cfs          
Pembina River Vang Bridge 8/15/2006 14:57 30 23.08 28.5 26 2.5   14.0/10.0 48 0.539 8.88 11.75 94 3 5 4 in. 4.0 in. 61 ft. Red River-Pembina -98.05599 48.91693   l/sl/m 30 ft. 23.1 sec 29.92 in. Hg 7 mph NW 119 cfs 2ppm 0 ppm 40 JTU 9 14%
Pembina River Vang Bridge 9/29/2006 12:55 20 9.53 25.6 24.2 1.4   55.4/39.6 8 0.875 8.91 14.07 73.6 2 1B trace trace 60 ft. Red River-Pembina -98.05599 48.91693 logs still in river l/sl/c 30 ft. 32.3 sec   4.5 mph NW 46.8 cfs 0 ppm 0 ppm 0 JTU 8.5 40%
Pembina River Vang Bridge 11/8/2006               9:50 11 8.9 28 26 2 N/A 50/40 9 0.882 8.02 13.96 98.2 5 1B trace 0.5 60 ft. Red River-Pembina -98.05599 48.91693 trees  down water low l/sl/c 30 ft. 47sec   10 mphW 46.0 cfs N/A N/A N/A 7.49 Quite Foggy
Stream Name Sample Site Date Time TempAir - C Temp H2O - C Tape Down Bottom Tape Down Surface Stage (depth - ft) Gage Type Trans Tube (cm)1st/final Turbidity NTUs Conductivity ty uS/cm pH DO mg/l DO %Sat Rec Suit Appr Precip 24 hr Precip 2 - 5 Days Stream Width Watershed District Longitude Latitude Field Notes Condition Rating Bridge Width Average time Barometric Pressure Wind Speed/Direction Stream Flow CFS Phosphate Con Nitrate Conc. Chem-Turbidity Chem-pH Cloud Cover
Pembina River Hwy 32 Bridge 9/21/2004 10:10 11 15.07 23 21 2 N/A 0.8   0.646 8.13 9.18 91.3 4 5 2 in 2.5 in 90 ft RedRiver-Pembina -97.9172 48.913467 Log jam on farthest pillar   40 ft.                  
Pembina River Hwy 32 Bridge 10/15/2004 9:50 5 5.88 25.3 21.6 3.7 N/A 25 19.7 0.79 8.34 11.49 92.3 4 4 2.8 in 3 in 85 RedRiver-Pembina -97.9172 48.913467 snowing   40 ft.     N 8   2ppm 0ppm 40 JTU 8  
Pembina River Hwy 32 Bridge 11/17/2004 9:35 6 1.51 23.9 22 1.9 N/A   19.4 0.834 8.34 13.6 97.2 3 5 0 in 0 in 85 ft RedRiver-Pembina -97.9172 48.913467 log jam, animal tracks (deer, raccoon) n/mo/m 40 ft.     6mph/west 240 CFS         36%
Pembina River Hwy 32 Bridge 4/26/2005 9:50 17.2 8.11 32 16.5 15.5 N/A 3.9/2.9 99.9 0.008 7.92 9.62 81.8 5 3 trace trace 100 ft RedRiver-Pembina -97.9172 48.913467   h/sw/m 40 ft 9.2 sec   17.3mph/NW 4493 CFS 1ppm 0ppm 0 7.7 Slighty Cloudy
Pembina River Hwy 32 Bridge 5/13/2005 13:25 11 9.16 24.6 18 6.6   5.2/3.4 99.9 0.707 8.1 8.9 85.4 4 3 0.5 in 1.5 in 90 ft. Red River-Pembina -97.9172 48.913467 large log jam   40 ft. 6.6 sec   3.3 mph N 3600 CFS         mostly cloudy
Pembina River Hwy 32 Bridge 6/30/2005 13:30     25.7 9.5 16.2                   4 in 4 in 150 ft. Red River-Pembina -97.9172 48.913467 very rapid moving water& logs h/sw/m 40 ft. 5.5 sec     10,604 cfs          
Pembina River Hwy 32 Bridge 6/28/2005 11:00 18.9 17.62 25.7 16.7 9   2/1.6 99.9 0.032 7.97 8.01 83.8 4 3 0.5 in 2.0 in 100 ft. Red River-Pembina -97.9172 48.913467 log jams h/sw/m 40 ft. 8.69 sec   1.0 mph 2485.6 cfs 2 ppm 2 ppm 100+JTU 8.5 cloudy-completely
Pembina River Hwy 32 Bridge 7/5/2005 11:00 23.3 18.84 25.7 15 10.7   3.0/1.9 99.9 0.011 7.85 7.62 82 4 3 0.5 in 0.5 in 103 ft. Red River-Pembina -97.9172 48.913467 large log jam h/mo/m 40 ft. 7.02 sec hum-40.8% 2.2 mph 3768 cfs 3 ppm 0 ppm 100+ JTU 8 partly cloudy
Pembina River Hwy 32 Bridge 8/9/2005 16:45 27.4 24.05 25.7 18 7.7   3.5/1.2 99.9 0.03 8.11 8.34 99 3 3 trace trace 100 ft. Red River-Pembina -97.9172 48.913467 50% width-log jam n/mo/m 40 ft. 8.30 sec hum-31.1% 6.5 mph W 2227 cfs NA NA NA NA 40% cloud cover
Pembina River Hwy 32 Bridge 9/5/2005 10:57 26 19.94 25.7 19.7 6   6/4.75 167 1.443 8.33 9.34 103 3 3 trace trace 85 ft Red River-Pembina -97.9172 48.913467   l/sl/m 40 ft. 10.3 sec 29.76 in Hg 6.3 mph NW 1188 cfs 4 ppm 0 ppm   8.5 75%
Pembina River Hwy 32 Bridge 10/9/2005 14:00 16.2 8 26 21 5   9.0/6.0 64 1.537 8.41 12.79 107.8 2 5 2.5 in 2.5 in 90 ft Red River-Pembina -97.9172 48.913467 33% log jam & sandbar l/sl/m-c 40 ft. 28.43 sec   9 mph SE 380 cfs         2%
Pembina River Hwy 32 Bridge 11/1/2005 9:05 11 5.55 26 21.3 4.7   16/8 27 1.642 8.49 12.83 104.2 3 3 .1in .1 in 80 ft Red River-Pembina -97.9172 48.913467 60% Log Jam l/sl/m 40 ft 27 sec   none 332 cfs         80%
Pembina River Hwy 32 Bridge 11/2/2005 9:10 5.7 5.7 25 21.8 3.2   19/13.1 26 1.646 8.45 12.32 98.5 5 3 0.1 in 0.1 in 90 ft Red River-Pembina -97.9172 48.913467 30% obstruction l/sl/m 40 ft. 33.9 sec 29.5 in Hg 4 mph SE 208 cfs         100%
Pembina River Hwy 32 Bridge 4/27/2006 9:30 15.1 11.73 26 15.6 10.4   10.0/6.0 968 0.577 7.82 10.04 92.7 5 5 0 in. 0 in. 115 ft. Red River-Pembina -97.9172 48.913467 large pile of trees m/m/m 40 ft. 8.01 sec 29.79 in. Hg 4.5 mph N 3584 cfs 0 5 100+ JTU 7 0%
Pembina River Hwy 32 Bridge 5/26/2006 1:55 16.6 16.45 26 19.3 6.7   4.6/3.0 1000+ 0.78 8.14 9.95